Specifications

Appendix-b Cooling System Help
November 11, 2013
b2
Copyright©2013,HarrisBroadcast
WARNING:Disconnectprimarypowerpriortoservicing. 8882628300
b.2 Plumbing System Installation
b.2.1 Materials needed
Mappgastorchset
ExtraMappgastanks
Weldersmaskorgoggles
Tubingcutterfor2.5inchtubing(ahacksawmaybeused insteadofthetubingcutter)
Flux(StayCleanFlux)orequivalent(Harrispartnumber0860004040;one16ozbottleprovidedwithplumb
ingkit)
Softsilversolder(96.5%tin;3.5%silver)suchasAladdin#450(Harrispartnumber0860004038)isneeded.
Three1lbrollsof1/16inchsoftsi lversolderissuppliedwithplumbingkit.1/8inchsilversolder(Harrispart
number0860004047)isalsoavailable.
Wirebrushandrags
Waterhose
Threadrod,angleironorchannelandhangersneededtosupport theplumbing
Tubingcutterorahacksaw(alwaysdeburtheline(removeanyroughpointsorflaredinedgesatthecut
aftercutting)
Warning
TEMPERATURE OF THE HEATED LINE IN THE FOLLOWING STEPS IS QUITE HIGH.
PRECAUTIONS MUST BE TAKEN TO AVOID CONTACT WITH EXPOSED SKIN.
b.2.2 Pipe Sizing and Routing
Ifatypicalsystemlayoutisnotused,thetypicalplumbinglayoutshouldstillbeconsultedforpipesizeinformation
andconnectiondetailsandtechniquesattheamplifiercabinets,RFloads,pumpmoduleandoutsideheat
exchanger.Acustomplumbinginstallationmustnotundulyrestrictflowratesorchangethedesign
ofthecooling
system.Locatetheplumbingsothataccesstotransmittersystemcomponentsisnotrestricted.
Note
Pipes must be sized no smaller than shown on the typical plumbing layout drawing. Their routing should
minimize turns and long runs.
Ifadditionalamplifiercabinetsaretobeaddedtothesysteminthefuture,considertheseplanswhensizingand
layingoutthecoolingsystem.Doingsonowmayslightlyincreasetheinstallationcost,butwillgreatlylowerthecost
ofconversionlater.
Theplumbinglinesmustbetype“M”harddrawncopperwithsoftsilversolderedjoints(96.5%Tin,3.5%Silver;
Aladdin#450silversolderorequivalent).Anadequateamountofsoftsilversolder(Harrispart0860004038)is
suppliedwiththeplumbingkit.Goodsilverbrazedjointsareacceptablebutnot
required.Apoorlydonebrazedjoint
ismuchhardertorepairthanasoftsilversolderjoint.
b.2.3 Standard Coolant Plumbing Practices
Goodplumbingequipmentinstallationpracticeisrequiredtoensuresystemintegrity.Appropriatelymeasured,cut,
deburred,supportedandsolderedcopperpipesections,facilitatemechanicalintegrityofthecoolanttransportation
system.The“gluethatholdsthesystemtogetherisqualitysoldering.
Thisprocessincludesthe needtoconditionallsurfacestobesolderedbythoroughcleaningwithemeryclothora
nonsudsingscouringpad,withanevenapplicationofflux,liquidfluxbeingpreferred.Thisappliestoallcommon
surfacesofplumbingfittingsandstraightpipesections.Anyimproperlycleanedand
poorlyfluxedsurfaces,either