b.2 Plumbing System Installation
b.2.1 Materials needed
• Mappgastorchset
• ExtraMappgastanks
• Weldersmaskorgoggles
• Tubingcutterfor2.5inchtubing(ahacksawmaybeused insteadofthetubingcutter)
• Flux(StayCleanFlux)orequivalent(Harrispartnumber0860004040;one16ozbottleprovidedwithplumb‐
ingkit)
• Softsilversolder(96.5%tin;3.5%silver)suchasAladdin#450(Harrispartnumber0860004038)isneeded.
Three1lbrollsof1/16inchsoftsi lversolderissuppliedwithplumbingkit.1/8inchsilversolder(Harrispart
number086‐0004‐047)isalsoavailable.
• Wirebrushandrags
• Waterhose
• Threadrod,angleironorchannelandhangersneededtosupport theplumbing
• Tubingcutterorahacksaw(alwaysde‐burtheline(removeanyroughpointsorflared‐inedgesatthecut
aftercutting)
Warning
TEMPERATURE OF THE HEATED LINE IN THE FOLLOWING STEPS IS QUITE HIGH.
PRECAUTIONS MUST BE TAKEN TO AVOID CONTACT WITH EXPOSED SKIN.
b.2.2 Pipe Sizing and Routing
Ifatypicalsystemlayoutisnotused,thetypicalplumbinglayoutshouldstillbeconsultedforpipesizeinformation
andconnectiondetailsandtechniquesattheamplifiercabinets,RFloads,pumpmoduleandoutsideheat
exchanger.Acustomplumbinginstallationmustnotundulyrestrictflowratesorchangethedesign
ofthecooling
system.Locatetheplumbingsothataccesstotransmittersystemcomponentsisnotrestricted.
Note
Pipes must be sized no smaller than shown on the typical plumbing layout drawing. Their routing should
minimize turns and long runs.
Ifadditionalamplifiercabinetsaretobeaddedtothesysteminthefuture,considertheseplanswhensizingand
layingoutthecoolingsystem.Doingsonowmayslightlyincreasetheinstallationcost,butwillgreatlylowerthecost
ofconversionlater.
Theplumbinglinesmustbetype“M”harddrawncopperwithsoftsilversolderedjoints(96.5%Tin,3.5%Silver;
Aladdin#450silversolderorequivalent).Anadequateamountofsoftsilversolder(Harrispart086‐0004‐038)is
suppliedwiththeplumbingkit.Goodsilverbrazedjointsareacceptablebutnot
required.Apoorlydonebrazedjoint
ismuchhardertorepairthanasoftsilversolderjoint.
b.2.3 Standard Coolant Plumbing Practices
Goodplumbingequipmentinstallationpracticeisrequiredtoensuresystemintegrity.Appropriatelymeasured,cut,
deburred,supportedandsolderedcopperpipesections,facilitatemechanicalintegrityofthecoolanttransportation
system.The“glue”thatholdsthesystemtogetherisqualitysoldering.
Thisprocessincludesthe needtoconditionallsurfacestobesolderedbythoroughcleaningwithemeryclothora
non‐sudsingscouringpad,withanevenapplicationofflux,liquidfluxbeingpreferred.Thisappliestoallcommon
surfacesofplumbingfittingsandstraightpipesections.Anyimproperlycleanedand
poorlyfluxedsurfaces,either