Instructions / Assembly

5
INSTALLATION INSTRUCTIONS
Hardware Used
BB
x 16
CC
x 16
2
2. Insert two Side Beams(E) to Middle Beam(F).
· Assemble the Beam(E&F&E) to
Screen(A&B and C&D) by using Bolt(BB) and
Nut(CC).
Bolt M6 x 45mm
Nut
Hardware Used
AA
x 4
CC
x 4
3
3. Insert Top Up Tube(G) to Top Middle Tube(S),
then insert Top Middle Tube(S) to Top Down Tube(H).
· Insert Middle Down Tube(J) to Middle Up Tube(I).
· Insert Top Tube(G&S&H) and Middle Tube(J&I) to
Roof Connector(K).
· Insert Top Down Tube(H) to Left Up Screen(A).
· Assemble Middle Down Tube(J) to Middle Beam(F)
by using Bolt(AA) and Nut(CC).
Bolt M6 x 30mm
Nut
s
s
s
s
s