User's Manual
Chapter 5. The PacketWave AIM
5–12
10004880 Rev. D1
Figure 5-11 Alignment Window with SNR Graph
21. Click on the Finish button in the Alignment window.
22. A series of pop-up windows will display, showing the progress of the application.
The PacketWave equipment must perform automatic transmission strength and
radio gain adjustment, become operational, and perform IP stability testing before
the application is complete.
a. First, parameters are sent to the PacketWave 200; then the unit is reset and
the antenna alignment flag is set. This takes a few minutes of time, during
which the window shown in Figure 5-12 will be displayed.
Figure 5-12 Setting Antenna Flag Window