User's Manual
Table Of Contents
- Scope of This Manual
- Conventions Used in This Manual
- Intended Audience for this Manual
- General Cautions and Warnings
- List of References
- Overview Of Subscriber Station
- Installation of Subscriber Station
- Aperto Installation Manager
- Specifications
- Event Reporting
- Cables, Spares and Accessories
- Command Line Interface (CLI)
- Virtual Local Area Network
- Troubleshooting
- LIMITED EQUIPMENT WARRANTY (“Agreement”)
2–13
PacketMax 100/300 User Manual, 10007306, Rev J
Chapter 2. Installation of Subscriber Station
Figure 2-13 Power Over Ethernet Connections
Table 2-3 Ethernet Cable Pinouts
Step 5. Align the Outdoor Unit
There are two techniques to aid you in the CPE installation.
Using the AIM software tool. Temporarily mount the IDU close to the ODU to
facilitate a direct reading (fined-tuned alignment technique).
Using the ODU’s built-in pitch and tone capability (rough alignment technique).
Straight Cable (to Hub) Crossover Cable (to PC)
Pin 1: Tx+ Pin 1: Rc+ Pin 1: Rc+ Pin 3: Tx+
Pin 2: Tx- Pin 2: Rc- Pin 2: Rc- Pin 6: Tx
Pin 3: Rc+ Pin 3: Tx+ Pin 3: Tx+ Pin 1: Rc+
Pin 6: Rc- Pin 6: Tx- Pin 6: Tx- Pin 2: Rc-
Power cable
PoE-AC outlet
Cat 5 cable
PoE- PM 100 ODU
Cat 5 cable
PoE- PC or hub
Data Out
Data In