User's Manual

Table Of Contents
5–1
PacketMax 5000 Installation and Operation Manual, 10007678 Rev J
Chapter 5. Commissioning the Base Station
Commissioning the Base Station
This chapter highlights the procedure of bringing up the Base Station using initial CLI
configuration and creating configuration files in Element Management System (EMS)
and finally verifying operations.
This chapter covers the following topics:
Summary of Configuration of Base Station
Establishing an Ethernet Connection with Cat-5 Cable
Establishing a Serial Connection to the Base Station
Configuring DHCP
Obtaining the MAC Address of the Base Station
Selecting Management or Data Traffic
Provisioning the Base Station with WaveCenter EMS
Rebooting the Base Station
Verifying Operations
Ensuring Encryption
Upgrading Base Station Manually
5