User's Manual
Table Of Contents
- Scope of This Manual
- Conventions Used in This Manual
- Intended Audience for this Manual
- General Cautions and Warnings
- What is new?
- Overview Of Base Station
- 1.1 Conceptual Overview of the PacketMax System
- 1.1.1 Cell Size, Capacity, and Scalability
- 1.1.2 Frequency Bands
- 1.1.3 PacketMax Network Connectivity
- 1.2 Bridge Mode and VLAN Mode of Base Station
- 1.2.1 Bridge Mode
- 1.2.2 VLAN Mode
- 1.2.3 Point-to-Point Mode
- 1.3 Features of PacketMax System
- 1.3.1 The PacketMax System’s IP Network
- 1.3.2 Services
- 1.3.3 MIBs
- 1.3.4 Service Offerings and QoS
- 1.3.5 ARQ Feature
- 1.3.6 3 DES Encryption
- 1.3.7 Certificates and Management
- 1.3.8 Upgrades
- Base Station Components
- 2.1 PacketMAX Base Station
- 2.2 5-Slot ATCA Chassis
- 2.3 Wireless System Controllers
- 2.3.1 Major Differences Between WSC-S-24 and WSC-48
- 2.3.2 One Port WSC-S-24
- 2.3.3 QUAD Wireless Controller (QWC) Card - WSC-48
- 2.3.4 Compatibility matrix with radio
- 2.4 Main System Controller Card
- 2.5 MSC Redundancy
- 2.5.1 Redundancy support
- 2.6 AC Supply
- 2.7 Power LEDs and ESD connector
- 2.8 Hot Swap
- 2.8.1 WSC-48 Hot Swap
- 2.8.2 WSC-S-24 Hot Swap
- 2.8.3 MSC Hot Swap
- 2.9 Maintaining Proper Chassis Air FLow
- 2.10 Fan Unit
- 2.11 Serial Cable Pinout
- 2.11.1 Serial Connection Instructions
- 2.12 PacketMax 5000 Rear Panel
- 2.12.1 Grounding
- 2.12.2 DC Power Connection
- 2.13 AC Power Connection
- 2.13.1 Fuse
- 2.14 Base Station Radio
- Installing the Base Station IDU
- Installing the Base Station ODU Radio and Antenna
- 4.1 Radio Compatibility
- 4.2 Installing the Antenna
- 4.3 Installing the Base Station Radio ODU
- 4.3.1 3.3 and 3.5 GHz BSR Package Contents
- 4.3.2 5.8 GHz BSR Package Contents
- 4.3.3 Preparing and Mounting the 3.3 and 3.5 GHz BSR
- 4.3.4 Preparing and Mounting the 5.8 GHz BSR
- 4.3.5 Using the BSR with the Antenna and IDU
- Commissioning the Base Station
- 5.1 Summary of Configuration of Base Station
- 5.2 Establishing an Ethernet Connection with Cat-5 Cable
- 5.3 Establishing a Serial Connection to the Base Station
- 5.4 Configuring DHCP
- 5.5 Obtaining the MAC Address of the Base Station
- 5.6 Selecting Management or Data Traffic
- 5.7 Provisioning the Base Station with WaveCenter EMS
- 5.8 Rebooting the Base Station
- 5.9 Verifying Operations
- 5.10 Ensuring Encryption
- 5.11 Upgrading Base Station Manually
- 5.11.1 WSC upgrade
- 5.11.2 MSC Upgrade
- Event Reporting
- Command Line Interface (CLI)
- Cables, Spares and Accessories
- System Specifications
- D.1 Physical interfaces of PM 5000 - 12 sector
- D.2 Physical interfaces of PM 5000 - 4 sector
- D.3 QoS and Networking Parameters
- D.4 Dimensions and Weight
- D.5 Environmental
- D.6 Radio Specifications
- 4.6.1 PM-BSR-33 and PM-BSR-35 Radio Specifications
- 4.6.2 PM-BSR-58 Radio Specifications
- 4.6.3 Antenna Specifications
- D.7 Antenna Types, Maximum Gains and Maximum Output Power Point to Multipoint Operation
- D.8 Transmit Output Power Regulations
- Certifications
- Troubleshooting
4–11
PacketMax 5000 Installation and Operation Manual, 10007678 Rev J
Chapter 4. Installing the Base Station ODU Radio and Antenna
NOTE: Be sure to use outdoor UV rated cables.
To install the radio IF signal cable, perform the following steps:
A. Run an appropriate length of cable from the Base Station to the radio. Include a
service/drip loop as appropriate.
B. Install a weatherproof female F connector at the radio end of the cable.
C. Attach the cable to the female F connector on the radio. Tighten the connector
until the cable is firmly secured, but do not overtighten.
D. Dress the outdoor portion of the cable as appropriate, making sure the cable has
adequate strain relief. Do not let the cable hang unsupported from the connector.
E. Install a Female F connector on the BS end of the cable.
F. Attach the cable to the Radio IF connector (IF connector located on the card) for
the appropriate Radio port on the Base Station Unit.
G. Dress the indoor portion of the cable as appropriate.
H. Seal the entry of the radio signal and control cables to the building as appropriate.
Step 7. Connect Surge Suppressors
To connect the relevant Base Station Sector to its BSR requires three lengths of cable
plus two lightning surge suppressor units.
Figure 4-1 shows the illustration that depicts
the overall picture of surge suppressors, BSR, and BS.
A. BSR to surge suppressor: Connect one cable from the BSR IF input to one side
of surge suppressor 1.
Figure 4-8 shows a PA-SP-OUTDOOR-O8 surge suppressor
and a BSR IF input picture.
B. Surge suppressor to surge suppressor: From the other end of the surge suppres-
sor 1 connect another cable, which is then attached to the surge suppressor 2.
C. Surge suppressor to Base Station: Connect the third cable from the other side of
surge suppressor 2 to the IF port on the Base Station.
LMR-240-75 150 meters
LMR-400-75 250 meters
LMR-600-75 350 meters
Table 4-2 LMR Cable Types and Maximum Lengths