User's Manual

Table Of Contents
3–4
PacketMax 5000 Installation and Operation Manual, 10007678 Rev J
Chapter 3. Installing the Base Station IDU
B. Mount the base station on a 19” rack, with the screws included with the base sta-
tion. Figure 3-2 shows mounting of base station with the screws.
i. Attach Rack Mount Brackets to side at each PM 5000 IDU.
ii. Pass the 4X1/4-20 TRUSS HEAD SCREW through the 4xNUT RETAINER.
iii. Mount the PM 5000 IDU on to the rack by securing the screw on to the rack.
Figure 3-2 Mounting Base Station -PM 5000
C. Ground the Base Station
i. Using the ground lug located in the lower left side of the back panel (See
Figure 3-3), ground the base station using either a 10 or 12 Gauge standard
insulated copper wire.
ii. Be sure to observer all grounding and lightning requirement as described in
Chapter 4.
Table 3-B Parts List and Part Numbers
Parts Part Numbers Description
a 10007456 Serial Cable
b 10002537 Nut Retainer (U-Style)
c PM BSU-CD-ROM PacketMax Software and Documentation
CD-ROM
d 10004194 Screw Cover (plastic)
e 10002438 1/4-20x0.75 in long Truss Head Screw
Mount the Base Station in
rack