Installation manual
29
Wiring Diagram
Additional Systems: Twin Zone System.
Note: Where an open heating circuit has not been
installed with sufficient volume required for the defrost
cycle the output from PIN 11 should be connected as
shown to enable the heat pump to open a heating circuit
during the defrost cycle. Parameter 108 must be set to 1.