Instructions / Assembly
INSTALLATION FOR RO SYSTEM WITH UV LIGHT OPTION
©2019 APEC Water Systems. All rights reserved. v.2019.1 www.FreeDrinkingWater.com
Yellow Tubing
to Tank
Clear Tubin
g
to Faucet
Red Tubing
from
 Wa
ter Source
G
F
J
Install UV BULB into UV Light:
1) Please connect UV bulb to transformer.
2) Connect the UV bulb pins to the transformer (Fig. 2)
3) Insert the UV bulb all the way into the UV light securely 
and make sure the transformer fully covers the UV light 
bulb entry point (Fig. 3 & Fig. 4) 
Fig. 2
Fig. 3 Fig. 4
Tank Connection: See Fig. 1 below. 
Remove the plastic end plug from the UV Light T-fitting at Point G. To remove the end plug, push in 
and hold down on the collet ring squre into the fitting. With the ring in this position, you can now 
remove the end plug. Next, connect the Yellow tank tubing to the T-fitting. To connect, simply push the 
tubing into the Quick Connect fitting then gently pull back on the tubing to make sure connection is 
secured.
Your RO system includes a UV light option. The UV light is added to your system at Stage-5 (before 
final stage carbon filter). So instead of feeding the tank Yellow tubing to the Stage-5 filter T-fitting, you 
will now feed the yellow tubing into the UV light T-fitting.
Note: The rest of the RO installation is the same as stated in the Installation Manual, please 
follow the Manual step by step for all the other connections.
Fig. 1

