Instructions / Assembly
12
7. Point Y Tank’s input & output connection:
Tank Shut-Off Valve Kit: The tank-shut off kit includes 2 parts. A Shut-off valve and a Tank Output Adap-
tor. They are NOT tightened when we ship out the tank. At this point, wrap Teflon tape onto threaded parts
on the tank adaptor. Put the 2 parts together and tighten them to secure no-leak connection. Please do not
over-tighten for it may crack the plastic shut-off valve!
Put Valve onto Tank: Apply 5-6 wraps of Teflon tape on the tank’s threaded metal stem. Screw the tank
valve onto the tank’s stem, as shown in Fig.7 above.
Connect tank line: Connect the 3/8” yellow tubing from Stage-5 T-fitting to tank’s valve.
Option: Feeding a 2nd Outlet
If you want to connect product water from the RO to a 2nd outlet, you will need:
• One 3/8” T-fitting, preferably the quick-connect type fitting.
• Extra 3/8” tubing long enough to go from the RO system to your 2nd outlet
• Optional: One 3/8” shut-off valve, preferably the quick-connect type.
Before connecting the output water line from Point Z to H, add a T-fitting near point H (see Fig.6A) to divert
product water to both the faucet and your 2nd output point.
Fig. 7
Fig.6A
Pure Water
Output Faucet
Tank Ball Valve
Drain Saddle
Pure Water
Holding Tank
G
Y
H
Z
X
A
W
Water
Fa
uc
e
Tee Fitting to
second output
Ball Valve
(Recommended)










