Instructions / Assembly

11
1. Point Z Faucet connections:
Tubing color: Clear tubing. Connect the 3/8” CLEAR tubing to the base of the RO faucet.
Fitting type: Quick-Connect fitting. No Teflon tape needed here.
2. Point X Feed water connection:
Tubing color: Red tubing. Connect the 3/8” RED tubing to the Feed Water Ball Valve.
Fitting type: Metal compression nut fitting. No Teflon tape needed here.
3. Point W Waste water connection:
Tubing color: Black-tubing. Connect the 1/4” BLACK tubing from the RO to the Drain Saddle.
Fitting type: Quick-Connect fitting on drain saddle. No Teflon tape needed here.
4. Point A System water inlet (to Stage 1 prefilter) connection:
Tubing color: Red tubing. Connect the 3/8” RED tubing from the Feed Water Ball Valve to the RO’s stage 1
pre-filter.
Fitting type: Quick-Connect fitting here. No Teflon tape needed here.
(UV Light: If your RO has a UV light at Stage-0, then connect the Red tubing to the UV light
inlet port).
5. Point H Stage-5 filtered water to faucet connection:
Tubing color: Clear tubing. Connect the 3/8” CLEAR tubing from the faucet base to the last stage post
carbon filter’s outflow end at point H. (See “Flow ” arrow on the filter for flow direction).
Note: Remove the “end plugs” from the filter to open up the ports.
Fitting type: Quick-Connect fitting. No Teflon tape needed here.
(UV Light: If your RO has a UV light at the last stage, then connect the Clear tubing from the
UV outlet port to the RO dispense faucet).
6. Point G Last Stage Post Carbon filter’s T-fitting connection:
Tubing color: Yellow tubing. Connect the 3/8” YELLOW tubing to last stage filter’s T-fitting.
Fitting type: Quick-Connect fitting (remove protective “end plug” from the T-Fitting to open the port).