- 2 - Cooling Assembly Service
Site Environment
Activities Description
Design Conformance
CPCS will check that the cooling equipment position conforms to the
floor layout specifications and to the manufacturer’s guidelines to
achieve proper performance.
Documentation
CPCS will document the discovery of issues which may inhibit the
successful deployment and operation of the cooling equipment
Product Specific Details
Product Activity Description
ACDA901
Inside equipment delivery is performed by others.
The floor must be engineered to support the operating weight of the
equipment.
Assembly service does not include attachment of hardware to the
building structure.
Location of the RDU must not exceed the limitations of the maximum
refrigerant piping length.
Location of the RDU must allow for adequate service and height
clearances.
If placed within a row, the RDU can only be placed at the end of a
row.
Assembly service does not include installation or connection of
external piping for fluid or refrigerant.
Input power wiring supplied by others when hard wired to equipment,
or located within 1.2 m (4 ft) of equipment receptacle when using
supplied power cords.
ACOA500/501
Inside equipment delivery is performed by others.
The ACOA will only be installed in an approved mounting frame and
must be able to support the operating weight of the equipment.
Location of the ACOA must not exceed the limitations of the
maximum refrigerant piping length.
Assembly service does not include installation or connection of
external piping for refrigerant.
Input power wiring connection must be located within 1.2 m (4 ft) of
equipment receptacle and must allow for connection of supplied
power cords.