Specifications
Smart-UPS® VT ISX w/transformer, 20-30 kVA, 480 V, Installation
2
Input Cabling
Bottom entry
Feed the input cables in conduits through holes in the bottom entry.
Guide the input cables through the blanking plugs and use cable ties
to attach the cables to the slotted plate.
Connect the input cables (L1, L2, L3) to the cable landings using a
torx screwdriver.
Connect the PE cable using the provided earth screw (earth symbol
beneath the applicable screw).
L1
L2
L3
PE
Top entry
Feed the input
cable in conduits
through the
punched holes in
the top.
Attach the cable
to the side panel
using cable ties
Guide the input
cable through the
blanking plugs.
Attach to slotted
plate.
Connect the
input cables
(L1,L2,L3) to the
cable landings
using a torx
screwdriver.
Connect the PE
cable using the
provided earth
screw (earth
symbol beneath
the applicable
screw).
Reinstall the
bottom cable
landing plate.
L1
L2
L3
PE
Smart-UPS® VT ISX w/transformer, 20-30 kVA, 480 V, Installation
3
Battery Cabling
Bottom cabling entry
Remove the top cable landing plates.
Feed the battery cables through the punched holes in the bottom plate.
Guide the cables through the blanking plugs.
Use cable ties to attach the cable to the slotted plate.
Connect the battery cables Bat+ and Bat– and the N cable in the
designated areas (indicated on the PCB behind the cable landing
area).
Note
The UPS may ONLY be connected to the APC SUVTBXR
Battery Enclosure.