8.1 Place system to provide direct connections
to:
combustion air/vent piping system,
natural gas piping,
return and supply duct-work,
condensate removal system,
electrical connections.
8.2 Instructions for preparation and placement
of Hydronic freewatt
PLUS
System:
Determine location for boiler, MCHP and indirect hot
water tank (if used), identify location for hydronic
HI module, relay switches and circulators. Typical
con guration for Hydronic
freewatt PLUS
System is
shown in Figure 2-1.
Place crated boiler and HONDA MCHP unit as close to
selected location as possible and un-crate units.
Follow instructions outlined in
freewatt PLUS
Boiler
Installation, Operation and Maintenance Manual for
placing boiler. See Figure 2-2 for boiler details.
System con guration and nal placement should allow
for future servicing of equipment.
See Figure 8-2 for typical piping schematic to assist
in determining layout of
freewatt PLUS
system
components.
Reference HONDA MCHP Installation Manual for
instructions regarding placement.
Install MCHP unit base as speci ed in HONDA MCHP,
Model YM2Z, Installation Manual and Owner’s Manual
as summarized below and Figure 8-1.
Place base on concrete oor and level.
Mark anchor bolt locations on concrete oor.
Drill hole diameters in concrete for anchor bolts
per manufacturer’s installation instructions. If
obstruction is hit, move base and re-drill.
Attach base to anchor bolts with supplied hardware.
Locate washers between MCHP and base if unit
needs to be shimmed level.
Orientation of bolt & nut is important. Bolt must be
installed from top with nut on bottom. Use nuts and
bolts supplied in installation kit. Do not use shipping
bolts which attach MCHP to shipping pallet.
Do not make penetrations or drill holes in MCHP unit
cabinet.
CAUTION
Penetration or modi cations of MCHP cabinet will
result in potential electrical or re hazard. Do
not attach controls, wire, piping, conduit or other
hardware to MCHP unit.
Place HONDA MCHP on base and secure MCHP unit to
base with supplied hardware after base installed. See
Figure 8-1.
Determine location of Hydronic HI Module enclosure.
Mount enclosure on solid wall or partition. Recommend
enclosure be located close to HONDA MCHP. HI module
may be mounted up to 10 feet away from HONDA
MCHP unit. Locate enclosure with installation and
service accessibility in mind.
Hydronic HI Module bottom should be installed at
height of 32” to 42” above oor elevation where
base of HONDA MCHP is installed.
Ensure top of Hydronic Hybrid Integration (HI)
module is mounted above Honda MCHP’s top cover.
HI Module bottom should not be above MCHP top.
Hydronic piping between HI module and primary
hydronic loop manifold should not exceed 40 feet.
Piping and circulator should be designed for water
ow rate of 4gpm. HI module heat exchanger
pressure drop is approximately 1 psi.
Position enclosure, check for level, mark mounting
holes.
Start screws (#10 ,4 each, eld source) for keyhole
type mounting holes in upper corner(s). Tighten
screws down to about 1/8” (3mm) from surface.
Hang enclosure on screws, position enclosure and
start bottom screws.
Tighten all screws.
Figure 5-1 MCHP Base Installation
8 - PLACING THE SYSTEM