Configuration – Connection of Load to the PDU
18 Smart-UPS® ISX 30-40 kVA, 400V Operation 990-2820A
Connecting 3-phase load to PDU II
Set the applicable breaker set to the OFF position.
Guide the load cable down through the top hole.
Lift up the receptacle cover and connect the load to the
CEE 32A outlet.
Set the breaker set to the ON position.
Connecting 1-phase load to PDU II
Set the applicable breaker to the OFF position.
Guide the load cable down through the top hole.
Lift up the receptacle cover and connect the load to the
CEE 16A outlet.
Reset the breaker to the ON position.