Specifications

SURT Stack/Rack-Mount 12U 14000/18000 VA 200 Vac 15000/20000 VA 208/240 Vac 7
Install rails in rack
For details on rail installation refer to instructions included in rail kit package.
Install units in rack
Secure UPS and battery pack in rack using cage nuts and ornamental screws included in package.
Four ornamental screws and two cage nuts must be used to secure each unit.
A cage nut must be used in the top hole of each rack-mount bracket when securing the unit in the rack.
The bottom hole of each rack-mount bracket can be secured using an ornamental screw in the threaded
hole.
Install battery modules
For UPS operation, all eight battery modules must be installed.
su0338a
su0171a
4x
4x
su0172a
su0173a