Specifications
SURT Stack/Rack-Mount 12U 14000/18000 VA 200 Vac 15000/20000 VA 208/240 Vac 15
Hardwire the load
1. Remove appropriate circular knockout from output wiring tray.
2. Install appropriate strain relief (not supplied), for hardwire cables.
3. Connect ground terminal first. Then connect the remaining wires. Route wires through the
knockout hole to the terminal blocks. See diagram below. Refer to “Wiring Specifications” on
page 11.
Install output wiring tray in UPS
Insert the wiring tray into the appropriate slot on the
UPS rear panel.
Tighten the screws to secure the tray to the UPS.
Su0350a
Su0180b
Ensure OSJ is secured to
output wiring tray using five
screws supplied.
Su0348a