User manual

SURT192RMXLBP2/SURT192RMXLBP2J User Manual 5
Installation
Batteries must be removed from battery pack and XLBPs prior to installing units in
stack or rack-mount configuration. Refer to instructions on packaging for details on
removing batteries from battery pack and XLBPs.
Always place the UPS above the battery pack and XLBPs.
Stack configuration
Rack-mount configuration
Read the Safety Guide included in the package and refer to Physical Specifications in this manual
before installing the UPS.
Install rails in rack
For details on rail installation refer to instructions included in rail kit package.
Total stack configuration height must NOT exceed 18U. The UPS
and battery pack together equal 12U. Adding one XLBP creates an
18U configuration.
For detailed instructions on installing batteries, and battery doors,
refer to Rack-mount configuration in this manual.
Install tie brackets
Four ornamental screws (supplied in battery pack package),
must be used to secure each tie bracket to the units.
su0182a
8x
8x
8x
su0167a
4x 4x
e
x
t
e
r
n
a
l
b
a
t
t
e
r
y
p
a
c
k
U
P
S
su0166a
2x
2x
e
x
t
e
r
n
a
l
b
a
t
t
e
r
y
p
a
c
k
U
P
S
Install rack-mount brackets
Four flat head screws
must be used to secure
each rack-mount bracket
to unit.
Install rail cleats
Two pan head screws must
be used to secure each rail
cleat to unit.