Operation Manual

Smart-UPS On-Line SRT5K/6K Tower/Rack-Mount 3U/4U14
Operation
Wiring Specifications
CAUTION
RISK OF ELECTRIC SHOCK
Adhere to all national and local electrical codes.
Wiring should be performed by a qualified electrician.
Use Snap-In strain relief(s) provided with the unit.
Refer to the Installation Guide for knockout panel sizes.
The UPS must be wired into a branch circuit, equipped with a circuit breaker rated as specified in the
tables below.
Actual wire size must comply with required amp capacity and national and local electrical codes.
Recommended input terminal screw torque: 16 lbf-in (2 Nm).
Failure to follow these instructions can result in minor or moderate injury.
SRT5K/6KXLT, SRT5K/6KXLT-IEC models
Input connections Wire to L1, L2,
Output connections Wire to L1, L2,
System Wiring Voltage Current full
load, nominal
External input
circuit breaker,
(typical)
Wire size,
typical
SRT5KXLT
SRT5KRMXLT
SRT5KXLT-IEC
SRT5 KRMX LT-I E C
Input
Output
208/240 Vac 24 A 30 A/2-pole
L6-30
(provided with the
UPS)
SRT6KXLT
SRT6KRMXLT
SRT6KXLT-IEC
SRT6 KRMX LT-I E C
Input
Output
208/240 Vac
33 A
29 A
50 A/2-pole 6 AWG