Owners manual

Smart-UPS On-Line SRT5K/6K Tower/Rack-Mount 3U/4U20
Config
Menu
Outlets
Power On
Delay
0 seconds 0-1800 seconds Select the amount of time the controllable outlet
groups will wait between receiving the command to
turn on and actual startup.
Power Off
Delay
90 seconds 0-32767 seconds Select the amount of time the controllable outlet
groups will wait between receiving the command to
shutdown and actual shutdown.
Reboot
Duration
8 seconds 4-300 seconds Select the amount of time the controllable outlet
groups will remain off before the UPS will restart.
Minimum
Return
Runtime
0 seconds 0-32767 seconds Select the amount of battery runtime that must be
available before the controllable outlet groups will
turn on using battery power, after a shutdown.
Loadshed On
Battery
Disable Disable
Enable
To conserve battery power the UPS can disconnect
power from controllable outlet groups not in use.
To configure the disconnect delay time for this
feature use the Loadshed Time On Battery setting.
Loadshed Time
On Battery
5 seconds 5-32767 seconds Select the amount of time the controllable outlet
groups will be allowed to function on battery power
before shutdown.
Loadshed On
Runtime
Disable Disable
Enable
To conserve battery power the UPS can disconnect
power from controllable outlet groups when the
Loadshed Runtime threshold is reached.
Loadshed
Runtime
0 seconds 0-3600 seconds When the selected runtime threshold is reached the
UPS will shutdown the controllable outlet groups.
Loadshed
Overload
Disable Disable
Enable
To conserve energy in the event of an overload
condition greater than 105% output, the controllable
outlet groups will immediately turn off. The
controllable outlet groups will only turn on again
with a manual restart command once the overload
condition has been corrected.
Config
Menu
Network
Manage
IP Address
Mode
Manual, DHCP,
BOOTP
Refer to the Network Management Utility CD.
IP Address
Program IP, Subnet,
Gateway
Parameters Default Value Options Description