User Manual

Smart-UPS On-Line SRT2200XLA/SRT3000XLA Tower/Rack-Mount 2U22
Replace the RBC in a UPS
An RBC should only be disconnected or removed from the UPS temporarily as part of the battery
replacement procedure.
Disconnect the connected battery module in the UPS. Slide the RBC out of the UPS.
Slide the new RBC into the UPS and connect the battery module to the UPS.
Securely connect the battery module. Press the battery connector into the UPS until it is firmly connected.
A battery that is not properly connected will cause erratic UPS operation, abnormal alert messages and
connected equipment may not receive battery power during power outages.
After installing the RBC, the UPS display interface may prompt the user to verify the status of the replaced
battery module. If the battery module is new, respond
YES. If the battery module is not new, respond NO.
Recommended actions after installing new RBC
Verify that the UPS is connected to input power and the output power is turned on. See “Operation” on
page 9 for instructions.
Perform a UPS Self Test.
Verify on the UPS display interface that the installation dates for the replaced RBC is set to the current date.
The installation dates can be changed manually on the UPS display interface.
For configuration details refer to Battery Install Date in the “General settings” on page 14 of this manual.
Allow the system to charge for 24 hours to ensure full runtime capability.
XLBP installation and replacement
Refer to the External Battery Pack Installation Guide for installation and replacement instructions.