Maintenance performed while the MBP is receiving input power
APC does not recommend performing maintenance on the MBP while it is receiving input power.
However, due to the critical nature of data center loads, there may be times when live maintenance must
occur. If you must perform maintenance while the MBP is receiving input power, observe the following
precautions to reduce the risk of electric shock:
• Never work alone.
• Perform the maintenance only if you are a certified electrician who is trained in the hazards of live
electrical installation.
• Know the procedure for disconnecting electricity to the MBP and to the data center in the event of
an emergency.
• Wear appropriate protective personal clothing and other body equipment.
• Use double-insulated tools. If double-insulated tools are not available, insulate all tools with
electrical tape.
• Always follow local codes and site regulations when working on the MBP.