Datasheet

Smart-UPS® VT, MGE™ Galaxy™ 3500 10-40 kVA 400 V Installation6
Site Planning
Environmental considerations
Ensure that the wall area you selected to install the MBP is structurally sound and able to support
the size and weight of the unit.
Note: See “Specifications” on page 13 for the size and weight specifications for your
particular unit.
Store or operate the MBP in a climate-controlled environment. Ensure a temperature of 0° to 40°C
(32° to 104°F) and a relative humidity of 0 to 95%, non-condensing.
Protect the MBP at all times from excessive moisture, construction dirt, corrosive elements, or
other contaminants.
Space considerations
Refer to the following figure to determine the space requirements for installing the MBP. Consult local
codes for any additional requirements. Ideally, install the MBP in a location close to the UPS.
Note: When choosing a location to mount the MBP, consider the need for easy access to all of
the switches and internal components.
Minimum front clearance
914mm
(36 in)
Minimum floor clearance
467mm
(18 in)