User Manual
Table Of Contents
- Safety and General Information
- Inspect the package contents upon receipt. Notify the carrier and dealer if there is any damage.
- SAVE THESE INSTRUCTIONS - This section contains important instructions that should be followed during installation and maintenance of the UPS and batteries.
- Inventory
- Connect the Battery
- BR650MI /BR900MI
- BR1300MI / BR1600MI
- Install PowerChute™ Personal Edition Software
- Installation
- Connect the Equipment
- BR650MI / BR900MI
- BR1300MI /BR1600MI
- Operation
- Power saving display
- Unit sensitivity
- Front panel buttons and display interface
- Alarms and System Errors
- Audible indicators
- Status icons
- System errors
- Function Button Quick Reference
- Troubleshooting
- Specifications
- Battery Replacement
- Warranty
- APC by Schneider Electric IT Customer Support Worldwide
- User Manual Back-UPS™ Pro BR650/900/1300/1600MI
Back-UPS Pro BR650MI / BR900MI / BR1300MI / BR1600MI
11
Battery Replacement
The battery typically lasts for 3 to 5 years, a shorter period if subjected to frequent
outages or elevated temperatures. Battery replacement parts for Back-UPS BR650MI is
APCRBC110, for BR900MI is APCRBC164, for BR1300MI is APCRBC165, and for
BR1600MI is APCRBC166. Delaying the replacement of parts may corrode the
batteries in the cartridge. Recycle spent battery cartridges.
Warranty
The standard warranty is three (3) years from the date of purchase, valid in European
Community. For all other regions, the standard warranty is two (2) years from the date of
purchase. Schneider Electric IT (SEIT) standard procedure is to replace the original unit
with a factory reconditioned unit. Customers who must have the original unit back due to
the assignment of asset tags and set depreciation schedules must declare such a need at
first contact with an SEIT Technical Support representative. SEIT will ship the
replacement unit once the defective unit has been received by the repair department, or
cross-ship upon the receipt of a valid credit card number. The customer pays for shipping
the unit to SEIT. SEIT pays ground freight transportation costs to ship the replacement
unit to the customer.
CAUTION
RISK OF HYDROGEN SULPHIDE GAS AND EXCESSIVE SMOKE
• Replace the battery at least every 5 years.
• Replace the battery immediately when the UPS indicates battery replacement is necessary.
• Replace battery at the end of its service life.
• Replace batteries with the same number and type of batteries as originally installed in the
equipment.
• Replace the battery immediately when the UPS indicates a battery over-temperature
condition, or UPS internal over-temperature, or when there is evidence of electrolyte leakage.
Power off the UPS, unplug it from the AC input, and disconnect the batteries. Do not operate
the UPS until the batteries have been replaced.
Failure to follow these instructions can result in minor or moderate injury and
equipment damage.