Service manual
14 InfraStruXure System – Service Manual – Installation and Start-Up 990-1467C
Basic Installation Procedure
This section provides the basic steps that you need to perform when installing InfraStruXure power and
rack components. Follow the references provided with each step for detailed instructions.
Warning: Do not begin installing your InfraStruXure system without an APC Field
Service Engineer present.
1. Unpack the components according to the unpacking instructions included on the outside of the
packaging or in the installation manual included with the component
Note: Search all boxes and packaging to make sure that they are empty before discarding.
2. Determine the correct placement of your system components by studying your InfraStruXure
Configure-To-Order (CTO) Report. Move the Symmetra PX UPS, InfraStruXure PDU, RDP, XR
Battery Enclosure, and NetShelter VX Enclosures to their final location.
Warning: If installing InfraStruXure on a raised floor, make sure that the raised-
floor structure has a lb/in
2
rating that will support the full weight of the
InfraStruXure installation. See “Weight Considerations” on page 9.
3. Level the PDU, UPS, RDP, NetShelter, and Battery Enclosures, using the 13/14-mm wrench
included with each unit.
See page 18 for detailed instructions.
4. Exchange side panels and run battery communication cables.
See page 20 for detailed instructions.
5. Join adjacent enclosures.
For instructions on joining the PDU, UPS, and XR Battery Enclosure see page 22.
For instructions on joining to RDP to a NetShelter VX Enclosure, or joining adjacent
NetShelter VX Enclosures, see the installation manual included with your enclosures.
6. Ensure total power off.
See page 23 for detailed instructions.