User`s guide

®
USER’S GUIDE
Switched Rack PDU
36
System requirements for outlet groups
To set up and use synchronized outlet control groups:
You need a 10/100Base-T TCP/IP network, with an Ethernet hub or switch that has a
power source not shared by the computers or other devices being synchronized.
If outlet groups are to be synchronized across multiple Switched Rack PDUs, those
Switched Rack PDUs must meet the following requirements:
They must be on the same subnet.
They must use firmware that has the same version number, which must be 3.3.1 or
higher for both the APC Operating System (AOS) module and the application
module.
You need a computer that can initiate synchronized control operations through the
Web interface or control console of the Switched Rack PDUs or through SNMP.
Outlet groups you synchronize must have the same Multicast IP address. Make sure
each Ethernet switch that connects Switched Rack PDUs allows Multicast network
traffic for that Multicast IP address.