User`s guide

®
USER’S GUIDE
Switched Rack PDU
29
Additional information on Home page
The IP address displays in the upper left corner.
A context-sensitive Help link and Log off link are displayed in the upper right corner of
every page.
Selecting a menu to perform a task
To do the following, see Configure Load Thresholds:
Configure the overload thresholds for each phase or bank.
Set the Name, Location, and Coldstart Delay for the Rack PDU.
Set the names and associated Web links for the outlets.
To do the following, see Configure and Control Outlet Groups
Apply power to and remove power from the outlets.
–Set Power On Delay, Power Off Delay, and Reboot Duration for the outlets.
Set the names and associated links for the outlets.
Create, enable, and use synchronized outlet groups.
To do the following, see Configuring event actions:
Access the event log.
Configure the actions to be taken based on the severity level of an event.
Configure SNMP Trap Receiver settings for sending event-based traps.
Define who receives e-mail notification and Syslog messages for events.
Test e-mail settings.
To do the following, see Data log (Logs>Data>options):
Access the data log.
Define the log interval (how often data will be sampled and recorded) for the data
log.
To do the following, see Administration: Network Features:
Configure new TCP/IP settings for the Rack PDU.