Specifications

Metered Rack Power Distribution Unit 3
How to Install the PDU
Installation guidelines
If the PDU is installed in an enclosed communications rack, the
recommended maximum ambient temperature is 45° C.
Install the PDU so that the amount of air flow required for safe
operation of the equipment is not compromised.
Install the PDU so that there is not an uneven mechanical load.
Follow the nameplate ratings when connecting equipment to the
supply circuit. Consider the effect that overloading the circuits
might have on over-circuit protection and supply wiring.
Maintain reliable earthing of the PDU. Give particular
consideration to supply-connections that do not directly connect to
the branch circuit.
Install the PDU so that the power plug is accessible to be
disconnected for service.
Attach the cord
retention trays
Attach the cord retention trays to the PDU, using four flat-head screws
(provided) per tray.
Attach cords to the tray
Attach a cord to the tray by looping the cord and securing it to the tray,
using a wire tie (provided).
Note
Each cord must be secured to the tray so that you can
unplug it from the PDU without removing the wire tie.