Specifications
Customizing and Updating the PDU
60 40kW InfraStruXure PDU—Operation and Configuration
Configuring and testing. Configuring and testing of the switch is
done through the EPO interface on the PDU monitoring unit. The figure
to the right shows the PDU monitoring unit and the location of the EPO
LEDs and DIP switches.
Testing the switch
1. Before testing the EPO switch, verify that the EPO DIP switches on the PDU monitoring unit
are configured properly for the signal type you are using. The labels above the switches and the
figure below show the correct settings for both the Normally Open (NO) and Normally Closed
(NC) position.
NO NC
USER / EPO C ONTACTSTO UPS
DISPLAY
10=G RN
100= ORN
NETWORK
POWER
RS-232
CON SOLE POR T
9600-8 -N-1
RESE T
TRIPPED
STATUS
LINK RX/TX
ARMED
TEST
EPO
885 -2288
12345678910111213
25 24 23 22 21 20 19 18 17 16 15 14
NO
NC
TRIPPED
ARMED
TEST
EPO
Note
The default setting on the EPO interface on the PDU monitoring unit is for a Normally
Open (NO) switch.
NO
NC
TRIPPED
ARMED
TEST
EPO
Normally ClosedNormally Open
or 24V AC/DC
Location of switches
on PDU monitoring unit