How to Apply Power to the System
This procedure instructs how to apply power to a system that has already been installed. For initial
start-up instructions, see the InfraStruXure System Installation and Start-Up manual.
1. Set the upstream mains circuit breaker to ON.
2. Set the Main Input switch on the
PDU to ON.
3. Close (turn ON) the Q1 breaker on the
PDU to apply power to the UPS.
4. Ensure that all battery units are pushed all the way into the Symmetra PX UPS and XR