Specifications
32 40kW InfraStruXure PDU—Operation and Configuration
How to Return from Maintenance Bypass
Operation
Note
Select Help from the top-level menu screen on the PDU display interface and select the
second help topic, Returning from PDU Maintenance Bypass, or follow the
procedure below:
1. Close (turn ON) the Q1 breaker on the PDU.
2. If applicable, close (turn ON) the XR Battery
Enclosure DC Disconnect breaker.
3. Set the UPS DC Disconnect breaker to ON and
then set the UPS System Enable switch to ON.
The UPS will show a Forced Bypass message on
the display interface, and the Fault LED will be
red.