Specifications

System Operation
40kW InfraStruXure PDU—Operation and Configuration 31
The UPS is now in maintenance bypass operation.
4. Set the UPS System Enable switch to OFF, and then
open (turn OFF) the UPS DC Disconnect breaker.
5. If applicable, open (turn OFF) the XR Battery
Enclosure DC Disconnect breaker.
6. Open (turn OFF) the Q1 breaker on the PDU.