Technical data
Guide Specifications
APC InRow SC Technical Data Manual 19
4. Logging: The microprocessor controller shall log and display all available events. Each
alarm log shall contain time/date stamp as well as operating conditions at the time of
occurrence. Controller shall display the run time hours for major components.
E. NETWORK MANAGEMENT CARD
The unit shall include a network management card to provide management through a com-
puter network through TCP/IP. Management through the network should include the abil-
ity to change set points as well as view and clear alarms.
F. EVAPORATOR AND CONDENSER COIL
Coil shall use raised lance with rippled edge type aluminum fin and 0.375in OD rifled
copper tube coils with 0.012in wall thickness. Coil end supports shall be a minimum 18
gauge G90 galvanized steel.
G. CONDENSATE PAN
Drain pan shall include a condensate pump and dual floats for control and overflow pro-
tection. Condensate pans are V-0 thermal formed, anti-fungal, non-ferrous material for
higher indoor air quality.
H. CONDENSATE PUMP
Factory installed and wired condensate pump shall pump 1.3 gal/h (4.9 liters/hour) at 16ft
(4.9m) of vertical lift and a 50ft (15.2m) horizontal run.
I. FILTERS
Standard air filter: <20% efficient per ASHRAE 52.1, MERV 1 per ASHRAE 52.2, 1/2in
washable mesh filter.
J. REMOTE TEMPERATURE SENSOR
Remote temperature sensor shall be shipped factory wired to the unit for placement in the
field to provide control input based on rack inlet temperature. Length is 14ft.
K. HOT GAS BYPASS
The unit shall use an electronic stepper valve for hot gas bypass operation. The actuator
will have 1596 steps from fully open to fully closed. The discharge gas will be piped to the
unit thermostatic expansion valve.
L. DUCTING KIT
Ducting kit with ceiling tile adapter is included with the unit. Duct tubes shall be 10in
(254mm) in diameter and 6ft (1.8m) long and constructed from UL 181 Class I material.