Installation manual

Connecting the power cables > Static-switch cabinet
34020846EN/AE - Page 35
1. Installation
2000 kVA
Remove the protective covers
You must have first assembled both cabinets, See “Assembling 2000 kVA SSCs”, page 61.
This operation must be carried out by qualified personnel.
The door must be opened using the Ronis 405 key.
Key:
(1) Front protective covers
(2) Roof protective covers
(3) Earthing bar
(4) To the earth
(5) To the UPS load terminal block*
(6) To bypass AC line
(7) To the load
* Or to the SSC maintenance cabinet; See “SSC maintenance cabinet”, page 42.
1 - Remove protective covers (1) and/or (2).
A
A
7
7
6
6
3
54
1
1
1
2 2
OFF
OFF
OFF
1
1
1
1
Connection through the top
Connection through the bottom
Right-hand view
Front view
Front view
Top view