43Rack Power Filter:
Controlling the outlets
PATH: Configuration and Control > Control
When you apply an outlet control action, the following delays are used for the action:
For an individual outlet, the action uses the Power On/Off delay periods and the Reboot
Duration configured for that outlet.
Outlet 1 and 2 are not Switched and only accept the reboot command.
If the outlet is ON, any On immediate /Delay commands to it are rejected.
If the outlet is OFF, any OFF immediate/Delayed and Reboot Immediate/Delay commands to it
are rejected
If the outlet is rebooting, any OFF immediate/Delayed and ON immediate/Delayed commands
to it are rejected
If a command is sent to several outlets, and one outlet rejects it, the command is cancelled to other
outlets.
If an Outlet Type is configured as Reboot Only, it cannot be turned on or off.
If the All Outlets check box is selected, selecting an individual outlet is ignored.
Controlling the outlets on your Rack Power Filter:
1. From the Configuration and Control tab, select Control from the left navigation menu.
2. Select the check boxes for each individual outlet to control, or select the All Outlets check box.
3. Select a Control Action from the drop-down box, and click Next >>. On the confirmation page
that explains the action, choose to apply or cancel it.
Control actions you can select
Note: 1. If either outlet 1 or 2 is rebooting, sending a Cancel Pending Commands to them
causes them to be turned on immediately. This is because outlets 1 and 2 are un-Switched
outlets.
Option Description
No Action Do nothing.
On Immediate Apply power to the selected outlets.
On Delayed Apply power to each selected outlet according to its value for Power On
Delay.
Off Immediate Remove power from the selected outlets.
Off Delayed Remove power from each selected outlet according to its value for
Power On/Off Delay
Reboot Immediate Remove power from each selected outlet. Then apply power to each of
these outlets according to its value for Reboot Duration.
Reboot Delayed Remove power from each selected outlet according to its value for
Power On/Off Delay Wait until all outlets are off (the highest value for
Reboot Duration), and then apply power to each outlet according to its
value for Power On/Off Delay.
Cancel Pending Commands Cancel all commands pending for the selected outlets and keep them in
their present state.