Owner`s manual
Installation
Connect and
route the cables
1. To the front of the Redundant Switch, connect the
communications cable and any accessory cables that
require front connections.
2. Route the cables around the Redundant Switch through
the side channel (marked with arrows below) to the
equipment in the rack.
3. Optionally, install a plastic twist-lock (provided) on each
side to secure the cables.
Redundant Switch