Datasheet

Product Description: Before Installation
6 NetShelter VX 25U Enclosure
Configuration
Before installing your enclosure, plan the location of the equipment to be installed. Consider the
space needed by the equipment and the ergonomics of keyboards and video monitors.
The NetShelter Configurator, available on the APC Web site, helps you plan your configuration to
maximize the available U-space of your enclosures.
The following blanking kits (optional) are available from APC. Each kit includes the panels and the
hardware to mount them.
Warn
i
ng
Improper airflow could damage installed components. To maintain proper airflow,
cover any empty vertical enclosure space with optional blanking panels (not
provided).
SKU Description
AR8101BLK 1 each of 1U, 2U, 4U, and 8U
AR8108BLK 2 each of 1U
AR8109BLK 2 each of 2U
AR8134BLK 2 each of 4U
AR8135BLK 2 each of 8U
Warn
i
ng
To avoid damage or injury, level and stabilize the enclosure in its permanent
location before loading equipment.