Datasheet
8 NetShelter VX Four-Post Open Frame—User’s Manual
Before Installation
Taking
inventory
After unpacking the frame, verify that all required components
and hardware have been shipped with the frame. See the earlier
section on product inventory.
Configuration Before installing your frame, plan the location of the
equipment to be installed. Consider the space needed by
equipment, ergonomics of keyboards and video monitors.
The NetShelter Configurator, available on the APC Web site,
helps you plan your configuration to maximize the available
U-space of your frame(s).
N
ote
If any items are missing, contact APC Customer
Support using a number or Web address listed on
the back cover of this manual.
W
arn
i
ng
To maintain proper airflow, cover any empty
vertical enclosure space with optional
blanking panels (AR8101 and AR8101BLK for
19-inch wide enclosures, not included).
Improper airflow could damage installed
components.
To avoid damage or injury, level and stabilize
the enclosure in its permanent location before
loading equipment.
NS UM 990-0398.book Page 8 Tuesday, February 12, 2002 10:26 AM