Datasheet
Installation: Install the InfraStruXure Manager
InfraStruXure Manager 5
Mount the InfraStruXure Manager and switch (or hub) in an enclosure
Leave room above the switch (or hub) to route data cables.
To install the InfraStruXure Manager in a NetShelter enclosure:
1. Insert caged nuts (provided with the enclosure) above and below the numbered holes on the
vertical mounting rails
a. Hook one side of the caged nut assembly through the far side of the hole.
b. Insert the caged nut into the square hole
c. Place the caged nut tool (provided) on the other side of the caged nut and pull to snap it into
position.
Note
This procedure describes how to install components in an APC NetShelter
®
enclosure.
If you are installing components in a different enclosure, the procedure may vary.
Warning
Install each caged nut horizontally. Do not install the caged nut vertically with the
sides of the caged nut engaging the top and bottom of the square hole.
1 U