Installation: Communication Connection
8 InfraStruXure Manager
Route network cables to the InfraStruXure Manager switch (or hub)
Overhead routing. This section is for InfraStruXure system installations.
1. Ensure that the APC Shielding Partitions and Cable Ladders are installed on the NetShelter
enclosures and the InfraStruXure PDUs.
2. Run the Cat-5 network cables (provided) from each APC device to the switch (or hub).
a. Start with the device farthest from the switch (or hub), and use the longest supplied CAT-5
cable.
b. Bundle cables together and route the bundles in the data cable troughs along rows and across
ladders, if necessary.
3. Connect each APC device’s network cable to any available port on the switch (or hub).
Install and route data cables (alternative routing)
If you must route data cables under a raised floor:
– Do not route data cables inside an InfraStruXure PDU to the floor, either within the power
cable conduit or in any other location. Induced voltages from the power cables may interfere
with data transmission. Route data cables out the roof of the InfraStruXure PDU and down
inside the first NetShelter enclosure to the floor.
– Induced voltages can also create problems under the floor when data cables are too close to
any power cables. Even if data transmission is successful after the initial installation, later
additions to power cabling under the floor for other equipment in your data center can
jeopardize the integrity of the data transmission for your InfraStruXure system.
Note
If possible, route data cables overhead, as described in “Overhead routing” on this
page. Using APC Shielding Partitions and Cable Ladders with your InfraStruXure
system reduces problems related to induced voltages for data transmission.