Installation manual
Battery Replacement
26 AIS® 3000 & XR Battery Enclosure 10-40kVA, 400V, Operation Manual – 990-2259
Install the Battery Module in the lowest available bay (4 across in 523mm UPS versions, 2
across in 352mm UPS versions).
Position the Battery Unit to slide in between the grooves and push completely into the UPS to
ensure connection.
Note
If a problem is reported, ensure that the modules in question are correctly installed. If the
problem persists, refer to the Troubleshooting section of this guide.
Note
Allow for a 24-hour recharging period of the batteries after system start-up / battery
replacement for battery monitoring data to become fully reliable.
UPS / XR