Installation manual

Air Filter Inspection/Replacement
22 AI 3000 & XR Battery Enclosure 10-40kVA, 400V, Operation Manual – 990-2259
Position the new air filters in the Front Panel, ensuring that the metal side of the air filters face
outwards.
Remount the plate between the upper and lower air filters and reattach the 2 wing nuts.
Reinstall the Front Panel.