Specifications

InRow RD Fluid Cooled Installation20
Mechanical Connections
Liquid piping
Note: Install all piping in accordance with applicable industry guidelines as well as local and
national codes and regulations.
The piping kit for the liquid lines is located in the cabinet. Route the two pipes through either the top or
bottom of the cabinet.
For each liquid line: Remove the fitting 2 from the end
of the pipe 4. Braze the fitting 2 to the inlet or outlet
line 1.
Use the provided gaskets (3 and 6 in the illustration)
for each connection. The other end of the pipe 5 is
installed to the Inrow RD piping 7. Unions are
tightened to 2.26 N-m (20 in-lb).
Insulate the liquid lines with the provided insulation.
See “Install kit” on page 5 for more information.
Condensate pump
The condensate pumps
2
(air cooled equipment shown)
are factory-wired and piped internally to the condensate
pan. The pumps are capable of moving liquid a
maximum of 15.2 m (50.0 ft), which may include a
maximum lift of 4.9 m (16.0 ft) as measured from floor
level. For example, if your lift is 3 m (10 ft), you only
have 12.2 m (40.0 ft) of usable run remaining. The
pumps also use an on-board condensate high level float
switch, which is wired into the alarm input for local and
remote alarm capabilities.
Condensate pump drain connection. Sufficient
PVC drain line
1
is supplied to route the drain to the
outside of the equipment. Provide additional drain line at
installation to allow routing to a remote drain.
Warning: Do not exceed the lift or the run length of the drain system.
na3418a
na2670a
Warning: To prevent equipment damage
from condensate, do not leave the
condensate drain line coiled inside the unit.
Route the condensate line out the top or
bottom of the unit as shown on the next
page.