Specifications
Manuals
Brands
APC Manuals
Kitchen Appliances
ACRD200
1
2
3
4
5
6
7
8
9
10
Table Of Contents
General Information
Overview
Save these instructions
Safety symbols that may be used in this manual
Cross-reference symbol used in this manual
Safety
Inspecting the Equipment
Storing the Equipment Before Installation
Moving the Equipment
Moving the equipment to its final location
Model Identification
Component Identification
Install kit
Exterior components (front)
Interior components (front)
Interior components (rear)
Electrical panel
Top piping and power access locations
Bottom piping and power access locations
Piping Diagrams
Water cooled piping
Glycol cooled piping
Connections Overview
Power connections
Piping connections
Insulation
Room Preparation
Air distribution
Incoming power supply requirements
Weights and Dimensions
Installation
Removing Doors and Panels
Door removal
Side panel removal
Positioning the Equipment
Remove the compressor shipping bracket
Service access
Leveling the Equipment
Stabilizing the Equipment
Floor brackets
Joining the Equipment to Enclosures
Joining to NetShelter® SX enclosures
Joining to NetShelter VX and VS enclosures
Mechanical Connections
Liquid piping
Condensate pump
Leak sensor (optional)
Electrical Connections
Control connections
Form C alarm contacts and shutdown input
Rack temperature sensor
A-Link connections
Building Management System (BMS)
Network port
OHE connections
Power Connections
Wiring configurations
Top routing
Bottom routing
Warranty
One-Year Factory Warranty
Terms of warranty
Non-transferable warranty
Exclusions
Warranty claims
Warranty Procedures
Claims
Parts
1
...
2
3
4
5
6
...
...
44