Specifications
Start-Up Procedure
150 kW InfraStruXure Power Distribution Unit 35
4. Close (turn ON) the main output breaker on the front of the PDU.
5. Close (turn ON) the individual PDU distribution panel circuit breakers.
Note
When the main output breaker is closed (turned ON), both PDU distribution panels
are energized.
Note
When the distribution panel circuit breakers are closed (turned ON), the PDU power
cables and connected equipment are energized.










