Specifications

26 150 kW InfraStruXure Power Distribution Unit
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
If you ordered overhead wiring, connect the prewired power cables from the PDU as follows:
1. Install the shielding troughs, shielding partitions, and cable ladders in such a way as to allow
you to route power cables from the PDU to each of the NetShelter VX enclosures.
2. Locate the numbers indicating the enclosure to which each power cable will supply power.
These numbers should appear on the roof of the PDU (where the power cables exit the
enclosure), and on the ends of each power cable.
3. Beginning with the enclosures farthest from the PDU: Run each power cable (within the
shielding trough) along the row and, if necessary, across one or more cable ladders to the
enclosure to which it will provide power.
4. Connect the appropriate power cable to APC power management equipment in the enclosure in
one of four ways:
For single-feed devices without redundancy: Attach a power cable directly to a rack PDU
installed in a NetShelter VX enclosure.
See also
For installation instructions, see the manual included with your shielding troughs,
shielding partitions, and cable ladders.
Note
The enclosures are not numbered. Consult your InfraStruXure Configure-To- Order
(CTO) report to determine the enclosure associated with each power cable.
Note
Ensure that the L21-20 twist-lock connector at the end of each power cable always lies
on top of any longer power cables in the shielding trough.