Site Planning: Basic Installation Procedure
12 150 kW InfraStruXure Power Distribution Unit
7. Connect an EPO switch to the PDU monitoring unit.
8. Install shielding troughs, shielding partitions, and cable ladders.
9. Install the Rack Automatic Transfer Switches (ATSs), the Rack Power Distribution Units
(PDUs), and other InfraStruXure rack-mount devices.
10. Route and attach power cables to each rack ATS and/or rack PDU.
11. Route and attach communication cables to the InfraStruXure Manager Hub (or Switch).
12. Start the system.
Only qualified, APC-trained personnel may perform a system start-up.
13. Configure the InfraStruXure Manager.
See page 17 for detailed instructions.
See also
For instructions, see the manuals included with your shielding troughs,
shielding partitions, and cable ladders.
See also
For instructions, see the manuals included with your rack automatic
transfer switches, rack power distribution units, and other
InfraStruXure rack-mount devices.
See page 25 for detailed instructions.
See page 31 for detailed instructions.
See page 33 for detailed instructions.
See also
For instructions, see the manual included with your InfraStruXure Manager.