Specifications

150 kW InfraStruXure Power Distribution Unit 11
Basic Installation Procedure
This section provides basic instructions for installing InfraStruXure power and rack components.
Follow the references provided with each step for more detailed instructions.
1. Unpack the components according to the unpacking instructions included on the outside of the
packaging or in the component’s manual.
2. Determine the correct placement of your system components by studying your InfraStruXure
Configure-To-Order (CTO) report. Move the InfraStruXure PDU and NetShelter VX enclosures
to their final location.
3. Level the PDU and NetShelter enclosures using the 13/14-mm wrench included with each unit.
4. Join adjacent NetShelter enclosures.
5. Ensure total power off.
6. Connect the power source to the PDU.
A licensed electrician must connect the power source.
Warning
Do not begin installing your InfraStruXure system without an APC field service
engineer present.
Note
Search all boxes and packaging to make sure they are empty before discarding.
Warning
If installing your system on a raised floor, make sure the raised-floor
structure has a lb/in² rating that will support the full weight of the
installation. See “Weight Considerations” on page 7.
See page 13 for detailed instructions.
See also
For instructions on joining adjacent NetShelter VX enclosures, see the
installation manual included with these enclosures.
See page 33 for detailed instructions.
See page 14 for detailed instructions.