Specifications

13Symmetra PX 48, 96, and 160 kW 400 V and 100 kW 208 V Operation
5. Use the display interface to turn the UPS load on:
Note: The H2 LED next to the Q2 switch will illuminate, indicating that it is safe to operate
the Q2 switch.
6. Set the Q2 switch on the PDU, PDU-XR or the external maintenance bypass panel to the ON
position.
Note: The H3 LED next to the Q3 switch will illuminate, indicating that it is safe to operate
the Q3 switch.
7. Set the Q3 switch to the OFF position.
a. Select UPS and press ENTER. b. Select UPS Power Control and press ENTER.
c. Select Turn UPS On Into Bypass and press
ENTER.
d. Select Continue Turn On and press
ENTER.
e. Confirm by selecting Yes, On Into Bypass and
press
ENTER.
f. Wait for the UPS to turn the load on.
g. The UPS is now ON.
UPS
Alarms
Power Dist
Switch Gear
Environment
Log
Admin
Help
UPS Power Control
UPS Status
UPS Tests & Diags
UPS Configuration
Turn UPS On
UPS On Into Bypass
available in bypass!
>Cancel
>Continue Turn On
Battery back-up not
Confirm:
UPS on Into Bypass
>NO, ABORT
>Yes, On Into Bypass
Turning UPS on Into
Bypass
please wait...
UPS’s output is now
in bypass
Press any key...