Specifications

Symmetra PX 48, 96, and 160 kW 400 V and 100 kW 208 V Operation12
Return to on line operation from maintenance bypass operation
1. Set the DC DISCONNECT switch to the ON position on all XR Battery Enclosures and the PDU-XR
(if applicable).
2. Set the Q1 switch to the ON position.
3. Set the
SYSTEM ENABLE switch on the UPS to the ON position.
Note: Wait approximately two minutes for the system to start.
4. Set the Q5 breaker to the ON position (if applicable).
UPS
100 kW
48/96/160 kW